Craigard v Westbury Homes (2026) EWHC 2453 (TCC): Dilapidations Expert Witness Lessons for Surveyors and Engineers From a £1.6m Claim (November 2026)

A landlord asked the High Court for £1,609,125.53 after its office tenant left. It was awarded £648,141.47. Much of the gap came down to one question, and to how well each dilapidations expert witness was able to answer it: did a worn-out heating and cooling system need replacing, or could it have been repaired?

The judgment in Craigard (Dartford) Ltd v Westbury Homes (Holdings) Ltd (2026) EWHC 2453 (TCC) was handed down on 29 September 2026 by His Honour Judge Keyser KC, sitting as a High Court judge in the Technology and Construction Court [1]. The Expert Witness Institute published a case update on it on 30 October 2026, drawing out the lessons for experts and those who instruct them [2]. Six experts gave evidence, and the judge's comments on them show what courts expect from surveyors and engineers in building disputes.

Key takeaways

  • The award was about 40% of the pleaded claim [1].
  • The two building services engineers did not file the joint statement the court had ordered. They filed two commentaries on each other's reports. The judge said: "I did not find that at all helpful" [1].
  • Neither engineer inspected the system, and one expert had far less material than his opposite number. The judge did not regard the evidence of either engineer "as very satisfactory" [1].
  • Gaps in the evidence do not prove a case. Treating unknowns as proof that repair was impossible had "a tendency to reverse the burden of proof" [1].
  • An expert who only values one side's version of events may leave the court with no usable figure. That happened to an otherwise "impressive" valuer [1].

What was the dispute about?

The building is a two-storey office block of 14,916 square feet at Crossways Business Park, Dartford, built in about 1998. The claimants bought the freehold for £3.1m in March 2021. The first defendant held a lease dated 9 July 2003, which ended on 8 July 2023 [1].

The lease required the tenant to keep the whole premises, including the "heating cooling and air conditioning apparatus", in "good and substantial repair and condition". After the lease ended, the landlord carried out a large refurbishment. It replaced the whole heating, ventilation and air-conditioning (HVAC) system with a new system at a cost of £566,089.15. A schedule of dilapidations dated 1 February 2024 followed, and the claim was issued on 8 November 2024 [1].

The landlord claimed £1,335,980.15 for remedial works (later reduced to £1,237,571.01 in the light of its own expert evidence), £218,145.38 for lost rent and £55,000 for professional fees. By trial, the tenant put the cost of remedial works at £344,440.39 [1].

What did the court decide?

Repair or replace: the burden was on the landlord

The judge found that the tenant had not properly maintained the HVAC system, that this was "a calculated failure", and that the system was out of repair when the lease ended. He also found the landlord was "not interested in the possibility of repairing" it [1].

Applying earlier Technology and Construction Court authority, the judge noted that a tenant "is entitled to perform the covenants in the manner least onerous to him". So if a reasonable specialist could have recommended either repair or replacement, damages are assessed on the basis of repair. The landlord had to prove replacement was necessary and did not do so. As the landlord had put forward no repair figures, the court used the tenant's engineer's costings, which totalled £163,504 for the HVAC works [1].

The landlord's own plans did not wipe out the claim

The tenant argued that the repair claim had been "superseded" because the landlord would have stripped the system out anyway. The judge agreed that it would have done so, but rejected the legal argument as "contrary to well established law". The cost of putting the premises into repair remains recoverable, subject to the statutory cap [1].

Lost rent was different. The judge held that this loss would have been suffered anyway because of the landlord's own improvement plans, so he awarded nothing for it [1].

Building fabric: the surveyor who inspected was preferred

On the fabric items still in dispute, the judge mostly preferred the landlord's chartered building surveyor. He allowed £59,601.44 for gutters and £144,383 for roof underfelt, and accepted the claims for fascias, soffits and carpets. He rejected a £3,000 window-cleaning claim as not proved [1].

What did the judge say about the dilapidations expert witness evidence?

Three pairs of experts gave evidence: chartered building surveyors, building services engineers and valuers.

An expert who was kept in the dark

The tenant's building surveyor wanted to inspect but was told, apparently by those instructing him, that he could not. When he wrote his report he had only the bundle prepared for a mediation, with no witness statements and no disclosure. The landlord's surveyor later shared photographs, which helped to resolve some points [1].

Two commentaries are not a joint statement

Under CPR 35.12, the court may direct experts to hold a discussion and then prepare a statement setting out the issues on which they agree and those on which they disagree, with a summary of their reasons [3]. In this case the engineers produced something else. The judge recorded that "instead of producing a joint statement as required by the case management orders, they produced two documents, each containing a commentary by one expert on the other expert's report and responses by the author of the report" [1].

"I did not find that at all helpful." (HHJ Keyser KC, paragraph 104)

Turning unknowns into conclusions

The judge found the landlord's engineer "had a tendency to rely on what was unknown", such as whether untested parts worked, whether old and new parts were compatible, and whether spares could be found, as showing that repair was "a minefield and so not feasible". This had "a tendency to reverse the burden of proof" [1].

The judge also found his handling of the source material "rather problematic". He placed most weight on the account of a contractor who had inspected for the landlord. But that contractor had not been asked to consider repair at all. His "report" bore an early date and read as if written then, yet it was, in the judge's words, "at best a reconstruction". The engineer did not address those problems [1].

Conclusions built on thin material, and a position that shifted

The tenant's engineer first wrote his report having seen only one of the three main source documents. A second source document was referred to in his revised report, where the judge found the reference had been "rather clumsily inserted into the text" [1].

He had also stated that all of a system's components "must be proven to be in disrepair to justify wholesale replacement". Pressed on this in cross-examination, he moved between "all", "a fair majority" and "beyond economic repair". The judge said he "rather tied himself in knots" and was "less than impressed" [1].

A valuation tied to one side's case

Section 18(1) of the Landlord and Tenant Act 1927 caps damages at the amount by which the breaches reduce the value of the landlord's interest. The landlord's valuer was described as "an impressive expert witness". The "main problem" was that his valuation was "entirely premised on the claimants' case" on the works needed. He had not been asked to value on the tenant's alternative case. Once the court rejected full replacement, he had given no figure it could use [1].

The tenant's valuer had done the opposite and gave figures on both bases. The judge followed his general approach, while preferring the other valuer's view of what a buyer would do, and left the parties to agree the final sums [1].

Why does this matter for surveyors and instructing solicitors?

The Expert Witness Institute's update draws practical points for both groups [2]. Read with the judgment, these are the main lessons.

For those instructing experts:

  • Arrange access to the building wherever possible.
  • Give the expert the witness statements and disclosure, not just an early bundle.
  • Do not assume which facts the court will find. Ask for opinions on the realistic alternatives.

For experts:

  • Follow the court's order on the form of the joint statement.
  • When new material arrives, think it through and rework the opinion properly. Do not bolt it on.
  • Be careful with documents prepared on a narrow brief.
  • Say plainly what is not known, and do not treat a gap as proof.
  • If instructions shut out an option the court may need, raise it with the instructing party.

Behind all of this sits CPR 35.3: an expert's duty is "to help the court on matters within their expertise", and that duty overrides any obligation to the party paying [3]. For wider context, see earlier guidance on expert witness roles in 2026 property litigation and on expert witness challenges in building safety disputes.

How were reports written before the dispute treated?

The landlord's engineering report was the only primary source that itemised and costed repairs, and the judge treated it as the most reliable evidence. Yet he also noted that the landlord's surveyor had asked for wording to be changed from "end of economic life" to "not in repair", which showed the report was obtained "to support a dilapidations claim". He bore that in mind on weight [1]. Survey scope matters years later, a point also made in this guide to what a modern UK building survey must cover.

What does this mean for property owners and tenants in London and across the UK?

The building was in Dartford, but the principles apply to commercial leases throughout England and Wales, including in London.

Frequently asked questions

What is a terminal dilapidations claim?

It is a landlord's claim for damages at the end of a lease, where the tenant has not left the premises in the condition the lease requires. The basic measure is the cost of the works needed to put the premises into that condition, plus related losses, subject to the statutory cap [1].

What is the section 18(1) cap?

Section 18(1) of the Landlord and Tenant Act 1927 says damages for breach of a repairing covenant "shall in no case exceed" the amount by which the value of the landlord's interest is reduced by the breach. Valuers usually give expert evidence on this [1].

Can a landlord claim the cost of a new system if the old one was out of repair?

Only if replacement was needed to meet the repairing covenant. In Craigard, the judge held that if a reasonable specialist could have recommended either repair or replacement, damages are assessed on the basis of repair [1].

Does a dilapidations expert witness have to inspect the building?

There is no absolute rule, and in this case the works had been completed before the experts could inspect. But the judge noted that it "does not help" when experts must rely on third-party material, and the surveyor who inspected was generally preferred [1].

Conclusion

Craigard is a case about ordinary shortcomings in expert evidence: no inspection, uneven access to documents, a joint statement in the wrong form, opinions built on gaps, and a valuation tied to one side's case. The landlord recovered £648,141.47 against a claim of more than £1.6m [1].

Next steps for anyone facing a similar claim: instruct experts early, before works destroy the evidence; give every expert the full papers and equal access; ask for opinions on each realistic scenario; and check the joint statement against the court's order before it is filed.

This article is general information only and is not legal advice. Anyone involved in a dilapidations or other property dispute should take advice on their own circumstances.

References

  1. Craigard (Dartford) Ltd & Anor v Westbury Homes (Holdings) Ltd & Anor (2026) EWHC 2453 (TCC), HHJ Keyser KC, 29 September 2026, The National Archives. caselaw.nationalarchives.gov.uk.
  2. Expert Witness Institute, case update by Sean Mosby, "Craigard (Dartford) Limited & Anor v Westbury Homes (Holdings) Limited & Anor (2026) EWHC 2453 (TCC)", 30 October 2026. ewi.org.uk.
  3. Civil Procedure Rules 1998, Part 35 (Experts and Assessors), rules 35.3 and 35.12, legislation.gov.uk. legislation.gov.uk.